Civil Projects



Civil Projects

Prawn Farm Rising Main Extension, Mackay Regional Council

Mackay Regional Council engaged Synergy Pipelines and Plumbing the project to construct a new sewer rising main, including construction of a y-section, into the existing main at Dump Road sewage Pump Station on Hennessey Street Bucasia. The new sewer main is constructed to bypass the existing barometric loop.

As the principal contractor, Synergy Pipelines and Plumbing oversaw the entire project and works were completed on time and in budget.

Works included:

  • Development and implementation of an environment management plan.
  • Demolition/ removal of existing Concrete slabs, access chambers and pipework.
  • Testing for Acid sulphate soils and its management.
  • Supply and installation of sewer main at varying depth.
  • Quality control by conducting acceptance testing and providing tailored reports.

These works were completed under the Mackay Regional Council Guidelines and met all approvals with positive outcomes.

East Point Subdivision – BMD Group, Stage 1R1 and 1A – June 2020 – On going

East Point is located at Mackay Harbour, the gateway to the southern Whitsundays. The $90 Million-10 stage development is proposed to stimulate economic growth, jobs, and tourism in Mackay. Planned stage one consists of 154 residential lots, a tourist hub, and a 238-site caravan Park.

Synergy Pipelines and Plumbing are contracted to complete the underground services for this project, which includes:

  • Installation of a sewer pump station including overflow connection and rising main.
  • Installation of sewer mains ranging from 150mm to 300mm dia. up to 4m deep.
  • Installation of stormwater drains ranging from 375mm-1350mm and RCBC’s of varying dimensions.
  • Installing side entry pits with lintel, 1050 and 1500mm dia. precast manholes at depths up to 4m.
  • Installing water main ranging from 100mm to 250mm, valves and hydrants, property services, and an underground PRV.

The project complies with Mackay Regional Council Guidelines, checks the HSEQ criteria and operating procedures set by our clients.

 

Mackay Regional Council, Rhapis Court, Andergrove – Sewer Main Realignment – April 2020

Mackay regional council approached Synergy Pipelines and Plumbing to be the principal contractor for this project. The proposed scope is to realign the sewer main away from units on Rhapis court and fill the existing sewer main to prevent more slumping.

Works included excavation and installation of new sewer main, 45m of 300mm sewer pipeline at 3m in depth the sewer main was through the back yard of an adjoining property and 14m of the sewer was at 1.6m from the shed to the center of the new main, install new manhole and house connection and re connect house drainage.

These works were completed under the Mackay Regional Council guidelines and inspections from Work Place Health and Safety all with positive outcomes.

 

FKG Industroplex Stage 7 Paget Qld 4740

Industroplex Mackay is strategically located in Paget, South Mackay.  Industroplex is a master planned industrial precinct offering purchasers and tenants opportunities in one of Mackay’s largest industrial developments.

Stage 7, consisted of a 2 lot, High impact industrial subdivision in which Synergy Pipelines and Plumbing completed the underground services for this project.  Works included construction of sewer gravity main using 150mm pipe, 2m – 4m deep along with the installation of precast insitu access chambers, maintenance holes and the connection of 150mm dia pipes covered for future connections.

 

Plantation Palms Estate – Stages 4B1, 4B2

Plantation Palms is Mackay’s revolutionary master-planned community, designed to offer greater space, value and variety. With parks, playgrounds and walking trails, Plantation Palms offers a unbeatable Northern Beaches lifestyle and is conveniently located close to shops, schools and other amenities.

Synergy Pipelines and Plumbing completed the underground services for this project. Works consisted of excavation and installation of water and sewer mains connected to each lot.

Sugarfield Estate, Stage 6

Sugarfields Estate is a multi – stage residential estate located South of Mackay in the growing suburb of Ooralea.

Synergy Pipelines and pluming completed the major underground services for this project.

Works included excavation and installation of new water and sewer mains including installation of storm water pipelines.

Sugarview Estate, Mackay – Stage 5A

Sugarview Estate is nestled in the picturesque and peaceful suburb of Richmond.  It is one of Mackay’s most prestigious land development projects comprising of around 260 lots in total.

Stage 5A consisted of 27 lots involving bulk earthworks cut to fill 30,000m3 and construction of 530m of new roads.

Synergy Pipelines and Plumbing completed the 780m of Storm water, 755m of Sewer and 690m of water mains.

The Waters Estate – Stages 3b, 3c, 3d, 5e

The Waters at Ooralea is a fully integrated Master Planned Residential Community development that will comprise approximately 2,500 home sites of low to medium density, with extensive open space and recreational areas including direct access to Bakers Creek.

The Waters Estate is situated adjacent to the Bruce Highway at the southern fringe of Mackay’s urban development area, all less than nine kilometres from Mackay CBD.

Synergy Pipelines and Plumbing completed the underground services for this project.

Works consisted of excavation and installation of sewer and water mains including all service connections to each lot.

Mackay Regional Sports Precinct

The Mackay Regional Sports Precinct is located at the CQUniversity Mackay’s Ooralea Campus.

The proposed $72 million Mackay Regional Sports Precinct will provide a vibrant space with specialised sport and recreational facilities for schools, sporting clubs, community groups, organisations, businesses and the general public. It will assist in hosting national, state and local sporting competitions and will boost tourism, development and liveability in the region. It will encourage future growth and community development in Ooralea.

Synergy Pipelines and Plumbing completed the underground services for this project. Works included installation of new water main and connection to the existing water service. Synergy also completed the installation of gravity sewer main, rising sewer main using eveloper pipe.

Sarina Norther Access Upgrade

Queensland Government /Main Roads as part of the Bruce Hwy Upgrade Program

The Sarina Northern Access Upgrade involves the construction of a 2-lane roundabout at the intersection of the Bruce Highway and Sarina Coast Road intersection and road resurfacing on the immediate approaches.

The project will also include duplication of the existing Bruce Highway on the approaches and departures to the upgraded intersection to provide two lanes in each direction, separated by a median.

The project aims to improve the safety and capacity of the intersection, and provide long term benefits for future growth.  Queensland Government Funding $14.36m

Synergy Pipelines and Plumbing completed the underground services.

Works included installing and relocating water mains using Class 3, 375mm diameter enveloper pipe. Night works were implemented and required traffic control, vacuum excavation, Water main pressure testing, and chlorination, shut down of the existing water main infrastructure so new connections could be made.

Evolution Park Estate
Address:
31 Boundary Road, Paget
Project:
Evolution Park Estate
Year:
2009-2010
Developer:
Mirvac
Engineer:
Requirements:
7m deep over 1.2klm in length Sewer mains, Insitu and precast manholes 28 in totally, sewer rising mains and pump station 8m in depth, de watering, council connections.

Glen Rowan Estate – Stages 2, 3 & 4
Address:
Kellys Road, Walkerston
Project:
 Glen Rowan Estate – Stages 2, 3 & 4
Year:
2011
Developer:
AV Jennings Ltd
Engineer: Opus Qantec McWilliam
Requirements:
Sewer mains, Insitu and precast manholes, house connections, council connections..

Andergrove Lakes
Address:
Beaconsfield Road
Project:
Andergrove Lakes Estate
Year:
2011-current
Developer:
Andergrove Lakes Pty Ltd
Engineer: Westera partners
Requirements:
Excavations up to 8m in depth, installations of 1.2klm’s of sewer mains, 800m of stormwater main up to 750mm in dia, 1.2klm’s of water mains, sewer cast Insitu and precast manhole, house connections on sewer and water mains, construction of stormwater pits, GPTS, precast and Insitu headwalls, box culverts, council connections.

Industroplex Industrial Subdivision
Address:
Farrellys Road, Paget
Project:
Industroplex Industrial Subdivision
Year:
2013
Developer:
FKP Mackay Turf Farm
Engineer: GHD
Requirements:
2.2klm’s of Water main and house connections.

Evolution Park Estate
Address:
31 Boundary Road, Paget
Project:
Evolution Park Estate
Year:
2009-2010
Developer:
Mirvac
Engineer:
Requirements:
7m deep over 1.2klm in length Sewer mains, Insitu and precast manholes 28 in totally, sewer rising mains and pump station 8m in depth, de watering, council connections.

Woodlands Estate – Stage 4 & 5
Address:
Bedford Road, Andergrove
Project:
Woodlands Estate – Stage 4 & 5
Year:
2013
Developer:
Urban Land Development
Engineer: SPA Consulting Engineers
Requirements:
Electrical and NBN conduit.

Mira Flores Estate Stages 1,2A,2B,3,4,5,6
Address:
Harveys Road, Mackay
Project:
Mira Flores Estate – Stages 1,2A,2B,3,4,5,6
Year:
2010-2014
Developer:
Echochaff
Engineer: Aurecon
Requirements:
Deep excavations up to 8m in depth, installations of sewer mains, stormwater main up to 1500mm in dia, water mains, sewer cast Insitu and precast manhole, house connections on sewer and water mains, construction of stormwater pits, GPTS, precast and Insitu headwalls, box culverts council connections, pump station and raising mains.

Mountain View Estate – Stages 3 & 4
Address:
Hennessy St, Bucasia
Project:
Mountain View Estate – Stages 3 & 4
Year:
2007-2008
Developer:
Craig Doyle Developments
Engineer: Hyder Consulting
Requirements:
Sewer mains, Insitu and precast manholes, council connections.

Manzelmann Estate
Address:
Mazelmann St, Andergrove
Project:
Manzelmann Estate
Year:
2007-2008
Developer:
Mr Manzelmann
Engineer: Paragon
Requirements:
Excavations up to 4m in depth, installations of sewer mains, stormwater main, water mains, sewer cast Insitu and precast manhole, house connections on sewer and water mains, construction of stormwater pits, GPTS, precast and Insitu headwalls, box culverts, council connections.

Rubyanna Pipelines
Address:
Bundabergd
Project:
Rubyanna wastewater treatment plant pipeline
Year:
2015
Developer:
Bundaberg council
Requirements:
Excavations up to 8m in depth, installations of 6klm’s of 600mm mains, 3klms 1200mm FRP.

Andergrove Lakes
Address:
Beaconsfield Road
Project:
Andergrove Lakes Estate
Year:
2011-current
Developer:
Andergrove Lakes Pty Ltd
Engineer: Westera partners
Requirements:
Excavations up to 8m in depth,installations of 1.2klm’s of sewer mains, 800m of stormwater main up to 750mm in dia, 1.2klm’s of water mains, sewer cast Insitu and precast manhole, house connections on sewer and water mains, construction of stormwater pits, GPTS, precast and Insitu headwalls, box culverts, council connections.

Boundary Road 2 Lot Subdivision
Address:
121 Boundary Road, Paget
Project:
Boundary Road – 2 Lot Subdivision
Year:
2012
Developer:
Ticwood Pty Ltd, Port Bingil Pty Ltd, Walpike Pty Ltd
Engineer: Paragon
Requirements:
Up to 4m in depth, installations of sewer mains, sewer cast Insitu and precast manhole, house connections on sewer, pre-packaged pump station and raising mains.

Edmonds Street – 2 Lot Subdivision
Address:
Edmonds Street, Mackay
Project:
Edmonds Street – 2 Lot Subdivision
Year:
2011
Developer:
Brad Kirkpatrick Builder
Engineer:
Requirements:
Sewer mains, Insitu and precast manholes, council connections.

Sugar View Estate – Stage 1
Address:
Mackay-Habana Road, Richmond
Project:
Sugar View Estate – Stage 1
Year:
2011
Developer:
Sugarview Developments
Engineer: Aurecon
Requirements:
18 block subdivision, Deep excavations up to 4.5m in depth, installations of sewer mains, stormwater main, sewer cast Insitu and precast manhole, house connections on sewer, construction of stormwater pits, precast and Insitu headwalls, box culverts council connections.

Beaconsfield Road – 5 Lot Subdivision
Address:
48 Beaconsfield Road, Beaconsfield
Project:
Beaconsfield Road – 5 Lot Subdivision
Year:
2012
Developer: Hagan and Baum Pty Ltd

Engineer: Owen Consulting
Requirements:
Sewer mains, Insitu and precast manholes, council connections.

Boundary Road
Address:
Boundary Road, Paget
Project:
Boundary Road
Year:
2012
Developer:
Camilleri Trust
Engineer: Paragon
Requirements:
Sewer and pump station.

Carroll Street – 10 Lot Subdivision
Address:
39 Carroll Street, Blacks Beach
Project:
Carroll Street – 10 Lot Subdivision
Year:
2012
Developer:
Venture Development Holdings Pty Ltd
Engineer: UDP Consulting Engineers
Requirements:
Excavations up to 3.5m in depth, installations sewer mains, water mains, sewer cast Insitu and precast manhole, house connections on sewer and water mains, council connections.

Clark Street – 4 Lot Subdivision
Address:
Clark Street, Eton
Project:
Clark Street – 4 Lot Subdivision
Year:
2012
Developer: Glen Cole

Engineer: Paragon
Requirements:
Water main and house connections, council connections.

Duncan Street – 2 Lot Subdivision
Address:
16 Duncan Street, West Mackay
Project:
Duncan Street – 2 Lot Subdivision
Year:
2012
Developer:
Barbeler Homes
Engineer:
Requirements:
Council sewer mains, excavations up to 2m in depth, installations sewer mains, sewer cast Insitu and precast manhole, house connections on sewer, council connections.

Palmview Village – Subdivision
Address:
Sams Road, North Mackay
Project:
Palmview Village – Subdivision
Year:
2012
Developer:
Palmview Village
Engineer: GHD
Requirements:
Excavations up to 3.5m in depth, installations sewer mains, water mains, sewer cast Insitu and precast manhole, house connections on sewer and water mains, council connections.

Pioneer Street – 7 Lot Subdivision
Address:
75 Pioneer Street, Glenella
Project:
Pioneer Street – 7 Lot Subdivision
Year:
2012
Developer: Hagan and Baum Pty Ltd

Engineer: Owen Consulting
Requirements:
Council sewer mains, installations sewer mains, sewer cast Insitu and precast manhole, house connections on sewer, council connections.

River View Estate – Stage 2
Address:
Heaths Road, Glenella
Project:
River View Estate – Stage 2
Year:
2012
Developer:
The Long Family Trust
Engineer: Paragon Consulting Engineers
Requirements:
Council sewer mains, Excavations up to 3.5m in depth, installations sewer mains, sewer cast Insitu and precast manhole, house connections on sewer, council connections.

Shoal Point Road – 2 Lot Subdivision
Address:
184 Shoal Point Road, Shoal Point
Project:
Shoal Point Road – 2 Lot Subdivision
Year:
2012
Developer:
Kennith Ambrose
Engineer: Paragon
Requirements:
Installations of sewer mains, stormwater main, sewer cast Insitu and precast manhole, house connections on sewer, construction of stormwater pit, council connections.

Boundary Road – 2 Lot Subdivision
Address:
121 Boundary Road, Paget
Project:
Boundary Road – 2 Lot Subdivision
Year:
2012
Developer: Ticwood Pty Ltd, Port Bingil Pty Ltd, Walpike Pty Ltd

Engineer: Paragon
Requirements:
Up to 4m in depth, installations of sewer mains, sewer cast Insitu and precast manhole, house connections on sewer, pre-packaged pump station and raising mains.