Rail Projects



Rail Projects

Blackwater Rail Shutdown 
Project:
Blackwater system culvert renewal Rail Shutdown
Year:
2016
Developer:
Georgiou
Engineer: Aurizon
Requirements:
60hr shutdown replacement of 5 separate culvert sections within a 5 kilometre area.

Aurizon site Decommissioning
Address:
Gladstone Qld
Project:
Cida vale rail loop Gladstone
Year:
2015-2016
Developer:
All Surface Civil and Mining
Engineer: Aurizon
Requirements:
Decommissioning of site offices 2500sqm land area removal of road base and revegetation of land. Rectification works on culvert scouring with gabbin rock mattress.

Coppabella shutdown
Address:
Coppabella Qld
Project:
 Coppabella shutdown
Year:
2016
Developer:
BMD
Engineer: Aurizon
Requirements:
Replacement of culverts and 250mtrs of rail reformation and installation of rail crossing

Dingo Site Decommissioning
Address:
Dingo Qld
Project:
 Dingo camp site decommissioning
Year:
2015-2016
Developer:
All Surface Civil and Mining
Engineer: Private
Requirements:
Decommissioning of site offices 1500sqm land area removal of road base and revegetation of land.